← All services

A bathroom finishedproperly, from behindthe walls to the last tile

M2 handles plumbing, waterproofing, tile, fixtures, lighting, inspections, and finish work under one contractor.

See finished bathrooms
Guest bath with dark tile and patterned wallcovering
01

Layout & Fixtures

Make the room work before filling it with finishes

Bathrooms have limited space and little room for layout mistakes. Matt works through fixture placement, vanity size, storage, lighting, and circulation before construction begins.

  • Vanities
  • Fixtures
  • Storage
  • Lighting
02

Tile & Finish Work

Careful layout is what makes the room feel finished

Tile lines, stone edges, trim transitions, fixture placement, and paint all meet within a small space. M2 plans those details together and carries them through the installation.

  • Tile layout
  • Stone
  • Paint
  • Trim transitions
03

Plumbing & Waterproofing

The work you cannot see matters just as much

Plumbing, waterproofing, ventilation, and inspections are handled as part of the same job. Responsibility stays with M2 instead of being divided among separate trades.

  • Waterproofing
  • Plumbing
  • Inspection prep
  • Sequencing

— Perspective

Small room.A lot of moving parts.No room for rushed work.

Why bathroom details matter

— How bathroom projects run

A small roomwith a clear plan

  1. 01

    Look closely at the existing room

    Matt reviews the layout, measurements, plumbing, ventilation, and any signs of water or structural problems.

    Start with the real conditions

  2. 02

    Choose the important materials early

    Tile, fixtures, vanities, and lighting affect both the layout and the schedule, so those decisions are made before demolition.

    Decide before demo

  3. 03

    Keep every trade coordinated

    Plumbing, electrical, waterproofing, tile, and finish work are sequenced carefully so one part of the job does not create rework for another.

    One contractor

  4. 04

    Walk every final detail

    M2 checks the room for function, finish quality, and the small items that are easy to overlook at the end of a job.

    Finished all the way through

— Related work

Finished workby category

See finished M2 bathrooms, including tile, vanities, plumbing fixtures, lighting, and close-detail finish work.

— Client Feedback

what M2's clients value

We would feel comfortable recommending M2 to friends and neighbors. The finished work and the way the project was handled both earned that trust.

When questions or decisions came up, we could reach Matt directly. We always knew who to call and what was happening next.

— Related services

Adjacent waysM2 can help

If the work extends into the kitchen or other parts of the house, explore kitchen remodeling and design-build.

  1. 01

    Kitchen Remodeling

    Full kitchen remodels, including layout changes, cabinetry, countertops, appliances, and lighting, plus the plumbing, electrical, and permits that come with moving anything.

    View Service →
  2. 02

    Design-Build

    M2 can design your project and build it, or step in as GC if you already have an architect. Layout, materials, permits, scheduling, and construction, handled by one team.

    View Service →

— Start

Planning a bathor powder room?

Tell Matt what needs to change. He can walk the room with you and explain what the complete job is likely to involve.